Engineering and Industry Building Topping Out Ceremony, Dec. 6

by Michelle Saport  |   

Friday, Dec. 6, 10:45 a.m.-12:30 p.m. Engineering and Industry Building Jobsite and Student Union Cafeteria

"Topping out" is the term used by ironworkers to indicate that the final piece of steel has been hoisted into place on a building, bridge or other large structure. This ceremony marks the progress being made on the Engineering and Industry Building as it reaches its maximum height. Please join in celebrating this construction milestone by signing this final piece of steel before it is lifted to the top of the building. The ceremony will be held outdoors with lunch to follow inside the Student Union. Please dress warmly!

Creative Commons License "Engineering and Industry Building Topping Out Ceremony, Dec. 6" is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
November Archive